Corral Canyon - Malibu Bowl Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Pipeline Replacement - Fairside Rd and Ingleside Way

 

Under Construction

 

This project will improve service reliability. LVMWD will install a new section of pipeline on Fairside Road and Ingleside Way.

(Update November 1, 2012)

Preliminary work will include pot-holing to determine the best routing for the new pipeline.

It will then be necessary to dig a trench for installing the new line. Water service may be interrupted from time to time.  Whenever possible, notice will be give prior to service interruptions.  After the pipeline is installed, pavement will be restored to its original contour.

During construction, please be sure your pets are in a secure location.

Sign up for e-Notification to receive timely updates about construction projects and more.

--------------

 

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer